HiWave-5 is characterized by the development of the Wet Kit, which consists of the WEC, comprising the Hull, the Shroud, the Mooring rod, and the Tidal regulator.
The Hull, in this project, is an innovative product characterized by being a sandwich made of composite fiberglass material produced by filament winding, with the purpose of effectively protecting the PTO from the marine environment.
The protocols for the maritime installation of the WEC were created within the scope of HiWave-5, considering the conditions present at the project's installation site.
PTO Production and Test (AB)
|
Composite Hull Production
|
Hull + PTO |
Morning rod and |
Site PreparationThe area for installation of the project was delimited and a reserve request was made - TUPEM nº 16/02/2017DGRM |
Submarine |
Anchor |
WEC |
MonitorizationThe performance of the WEC will be evaluated over time based on the existing maritime conditions |